VMC Group CPF Pouring Forms, are concrete pouring forms that consist of a structural steel channel perimeter frame, reinforcing steel and equipment mounting template with anchor bolts. They come in predetermined lengths and widths. In lengths they are available from 16 up to 144 inches. In width they are available from 18 - 228 inches. The CPF Pouring Form design is for the seismic isolator brackets to be offset with the perimeter frame. Mounting brackets and seismic isolators are not included with this product and are sold separately.

Features & Benefits

  • Predetermined sizes minimize lead time
  • Reinforced structural steel frame
  • Seismic capacity up to 2.0g
  • International Building Code® (IBC) compliant

Applications

  • Pumps
  • Fans
  • Compressors
  • Chillers
  • Other equipment

DOWNLOADS

RELATED SERVICES

Engineering

The engineers we employ hold the highest industry-recognized credentials in structural analysis, elastomer development and system dynamics.

Certification

We are the first ISO accredited PCA ISO-17065, third-party certification body for special seismic certification of non-structural building components and their mounting configurations by the ICC’s International Accreditation Service.

Test & Measurement

We are the only ISO 17025:2005 Accredited Seismic Simulation Test Laboratory with a triaxial shake table owned and operated by California licensed Structural engineers.

Testing Services Update
DCL now offers Nuclear Qualification and Testing services.

In partnership with Greenberry Industrial, we now offer testing services that meet the requirements of ASME NQA-1.

Call for more information.