Four Critical Factors in Relation to Building Code

Building code standards for seismic certification require that critical mechanical, electrical and plumbing equipment must endure higher ground acceleration levels, or risk being red tagged during inspection, or worse.

Richard T. Berger of The VMC Group participates in this article, Seismic Certification and the Consulting Engineer. 4 Critical Factors at Issue: Minimizing Liability, Good Specs', QA and Certified Equipment, first seen in Powerline magazine's March/April 2011 issue.

Download the article.